Equipment Database -- Dubai Branches
DWC
AL-QOUZ
DIC
JABAL ALI
EMAAR
🔍
Not connected
🔍
Not connected
LOADING LIVE DATA...
🔍
Not connected
LOADING BP-17,18 LIVE DATA...
🔍
Not connected
LOADING AL-QOUZ DATA...
🔍
Not connected
LOADING DIC DATA...
⚡ Weekly Reports — Dubai Branches
Plant Summary Reports
W17  —  20 Apr - 26 Apr 2026
Active Branches
0
DWC0plants
Al-Qouz0plants
DIC0plants
Jabal Ali0plants
Emaar0plants
Current Week
W17
20 Apr — 26 Apr 2026
Live: --:--:-- GST
Sites / Select a plant to open weekly report
DWC
● DWC 01 / 05
Dubai World Central
Al-Maktoum Airport
Largest ORYX's branch with 8 plants in Airport Al-Maktoum Dubai, with 680t/day of ice production.
Plants
8
DWC
Production
1,920 m³/h
240 × 8
Ice
680 t/d
daily production
Chiller
1,256 m³/d
chilled water
Al-Qouz
● AL-QOUZ 02 / 05
Al-Qouz Industrial
Al-Qouz Zone 3
Al-Qouz's ORYX plant (licensed under Alazzani name) deeply supplying Dubai's city centre with 4 batching plants, 3 ice-plants, and 1 chiller.
Plants
4
Al-Qouz
Production
900 m³/h
240×3 + 180
Ice
162 t/d
daily production
Chiller
360 m³/d
chilled water
DIC
● DIC 03 / 05
Dubai Industrial City
Dubai Industrial City
Dubai's first batching plant, started around 2018, currently running 3 batching plants, 2 ice-plants, and 2 chillers.
Plants
3
DIC
Production
760 m³/h
240×2 + 280
Ice
122 t/d
daily production
Chiller
320 m³/d
chilled water
Jabal Ali
● JABAL ALI 04 / 05
Jabal Ali Industrial
Jabal Ali Industrial First
Massive brand-new batching plant that started production in late 2025 — 4 batching plants, 3 ice plants, and 3 chillers.
Plants
4
Jabal Ali
Production
960 m³/h
240 × 4
Ice
270 t/d
daily production
Chiller
936 m³/d
chilled water
Emaar
● EMAAR 05 / 05
Emaar Site
Dubai Investment Park
Isolated project dedicated to supplying Emaar's development in DIP — full ORYX operation with 3 batching plants, 1 ice plant, and 1 chiller.
Plants
3
Emaar
Production
540 m³/h
180 × 3
Ice
90 t/d
daily production
Chiller
312 m³/d
chilled water
⚡ Daily Works Report — Dubai Branches
Work Order Dashboard
W17  —  20 Apr - 26 Apr 2026
Live: --:--:-- GST
Work Orders
001
generated this session
Job Cards
001
Job Cards referenced
Active Branches
5
DWC 8 plants Al-Qouz 4 plants DIC 3 plants Jabal Ali 4 plants Emaar 3 plants
Week
W17
Live • --:--:-- GST
Sites / Pick a day, then create a work order
DWC
● DWC 01 / 05
Dubai World Central
Al-Maktoum Airport
Largest ORYX branch — 8 batching plants, 680 t/d ice production, 1,256 m³/d chiller water.
Plants
8
DWC
Production
1,920 m³/h
240 × 8
Ice
680 t/d
daily production
Chiller
1,256 m³/d
chilled water
Al-Qouz
● AL-QOUZ 02 / 05
Al-Qouz Industrial
Al-Qouz Zone 3
4 batching plants, 162 t/d ice production, 360 m³/d chiller water — supplying Dubai's city centre.
Plants
4
Al-Qouz
Production
900 m³/h
240×3 + 180
Ice
162 t/d
daily production
Chiller
360 m³/d
chilled water
DIC
● DIC 03 / 05
Dubai Industrial City
Dubai Industrial City
3 batching plants, 122 t/d ice production, 320 m³/d chiller water.
Plants
3
DIC
Production
760 m³/h
240×2 + 280
Ice
122 t/d
daily production
Chiller
320 m³/d
chilled water
Jabal Ali
● JABAL ALI 04 / 05
Jabal Ali Industrial
Jabal Ali Industrial First
Massive brand-new batching plant that started production in late 2025 — 4 batching plants, 3 ice plants, 3 chillers.
Plants
4
Jabal Ali
Production
960 m³/h
240 × 4
Ice
270 t/d
daily production
Chiller
936 m³/d
chilled water
Emaar
● EMAAR 05 / 05
Emaar Site
Dubai Investment Park
Isolated project dedicated to Emaar's DIP development — 3 batching plants, 1 ice plant, 1 chiller.
Plants
3
Emaar
Production
540 m³/h
180 × 3
Ice
90 t/d
daily production
Chiller
312 m³/d
chilled water
ORYX PREVENTIVE COMMAND
--:--:-- GST
IDENTITY REQUIRED · PREVENTIVE MAINTENANCE

Sign in as your engineer profile to continue

Every entry you log is stamped with your name. Pick the engineer that matches the tasks you're about to record.

CLOUD SYNC READY · PICK ANY ENGINEER TO ENTER
Preventive Maintenance Tracker
Weekly Service Dashboard
W-- — -- -- - -- -- ----
Live: --:--:-- GST
Logged In As
Connecting...
Live Equipment Theatre — --
Week --
Activity Log
All completion entries — click × to remove if entered by mistake
0 entries
No entries yet.
Log Service Completion
Saved
Generate Weekly Report AL-QOUZ
Week W17 20 Apr – 26 Apr 2026
Batching Plants — Weekly Production (m³)
Lifetime Production — template baseline (fixed)
BP-04
235,907
BP-07
767,588
BP-08
601,075
BP-09
178,039
Batching Plants — Daily Status (✔ = Working, uncheck = Breakdown)
PlantMonTueWedThuFriSatSun
BP-04
⚠ BP-04 ISSUE:MonTueWedThuFriSatSun
BP-07
⚠ BP-07 ISSUE:MonTueWedThuFriSatSun
BP-08
⚠ BP-08 ISSUE:MonTueWedThuFriSatSun
BP-09
⚠ BP-09 ISSUE:MonTueWedThuFriSatSun
Ice Plants — Weekly Usage (tonnes)
tonnes
tonnes
tonnes
Ice Plants — Daily Status (✔ = Working, uncheck = Breakdown)
PlantMonTueWedThuFriSatSun
IP-05
⚠ IP-05 ISSUE:MonTueWedThuFriSatSun
IP-06
⚠ IP-06 ISSUE:MonTueWedThuFriSatSun
IP-07
⚠ IP-07 ISSUE:MonTueWedThuFriSatSun
Chilled Water — Weekly Usage (m³)
Chilled Water — Daily Status (✔ = Working / Seasonal Off, uncheck = Breakdown)
TueWedThuFriSatSun
PlantMonTueWedThuFriSatSun
WC-03
⚠ WC-03 ISSUE:Mon
Batching Plants — Weekly Preventive Maintenance Service (all plants)
BP-04/07/08/09
Generate Weekly Report DWC
WeekW1720 Apr – 26 Apr 2026
Slide 2 — BP-17/18/19/20 Weekly Production (m³)
Lifetime Production — template baseline (resets each report)
BP-17
22,949
BP-18
22,410
BP-19
25,613
BP-20
16,764
Slide 2 — BP-17/18/19/20 Daily Status (✔=Working, uncheck=Breakdown)
PlantMonTueWedThuFriSatSun
BP-17
⚠ BP-17:MonTueWedThuFriSatSun
BP-18
⚠ BP-18:MonTueWedThuFriSatSun
BP-19
⚠ BP-19:MonTueWedThuFriSatSun
BP-20
⚠ BP-20:MonTueWedThuFriSatSun
Slide 3 — BP-21/22/23/24 Weekly Production (m³)
Lifetime — BP-21 from template baseline; BP-22/23/24 start from weekly entry
BP-21
125
BP-22
— new
BP-23
— new
BP-24
— new
Slide 3 — BP-21/22/23/24 Daily Status (✔=Working, uncheck=Breakdown)
PlantMonTueWedThuFriSatSun
BP-21
⚠ BP-21:MonTueWedThuFriSatSun
BP-22
⚠ BP-22:MonTueWedThuFriSatSun
BP-23
⚠ BP-23:MonTueWedThuFriSatSun
BP-24
⚠ BP-24:MonTueWedThuFriSatSun
Slide 4 — Ice Plants Weekly Usage (tonnes)
t
t
t
t
Slide 4 — Ice Plants Daily Status (✔=Working, uncheck=Breakdown)
PlantMonTueWedThuFriSatSun
IP-12
⚠ IP-12:MonTueWedThuFriSatSun
IP-13
⚠ IP-13:MonTueWedThuFriSatSun
IP-14
⚠ IP-14:MonTueWedThuFriSatSun
IP-15
⚠ IP-15:MonTueWedThuFriSatSun
Slide 5 — Chilled Water Weekly Usage (m³)
Slide 5 — Chilled Water Daily Status (✔=Working, uncheck=Breakdown)
PlantMonTueWedThuFriSatSun
WC-08
⚠ WC-08:MonTueWedThuFriSatSun
WC-09
⚠ WC-09:MonTueWedThuFriSatSun
WC-10
⚠ WC-10:MonTueWedThuFriSatSun
WC-11
⚠ WC-11:MonTueWedThuFriSatSun
Slide 7 — All Batching Plants (BP-17 to BP-24) Weekly PM
BP-17 to BP-24
Daily Works Report SITE
Site: -- Date: -- Rows: 0
No. Asset Work Description Status Start Time End Time Maintenance In-Charge Work Order Reference Remarks
Rows auto-paginate at 8 per PDF page
Work Order — Detail Form WO No: --
Equipment / Site Details
Order Details
Requested / Required Works
Performed Works
Spare Parts / Material Used
Recommendations / Remarks
Maintenance Foreman
Maintenance Engineer
Maintenance Manager